01782 811900
Email Us
Manufacture, supply and installation of HVAC ductwork into new offices. Carry out site surveys for the production of detailed manufacturing and installation drawings based on consultant’s designs. Site coordination with the M/E manager throughout the project to ensure all time scales were met.
Design, manufacture, supply and installation of a dust extraction system on a coffee bean off-load plant. Several extraction hoods were designed and installed at key dust producing points. Carry out site surveys for the production of detailed manufacture and installation drawings. Full coordination with the client during design and installation.
Carry out site surveys and production of detailed drawings for the manufacture and installation of ducted systems for the ventilation of telephone exchanges vital for the efficient running of the national telephone network.
Design, manufacture, supply and installation of a ducted air system designed to maintain a set temperature range and humidity level to ensure the fault free running of ten special effects projection cameras on the Charlie and the Chocolate Factory ride at the above.
Design, manufacture, supply and installation of dust extraction and fume control systems within the aluminium smelting plant and surrounding areas.